Dam Engineering Feasibility Design Consulting Services for the Tualatin Basin Water Supply Project

  • Opens 3/3/2017
  • Closes 3/30/2017
  • Status Results Posted

Clean Water Services (CWS) wishes to retain a qualified consultant to perform dam engineering feasibility design related to the Tualatin Basin Water Supply Project (TBWSP).  CWS will evaluate the proposals and determine the most qualified firm with whom CWS will enter into negotiations.  This work will be part of a Joint Project with the United States Bureau of Reclamation (Reclamation), the owner of Scoggins Dam and will include Roller Compacted Concrete Dam Feasibility Design (RCC Feasibility Design), and Embankment Dam Feasibility Design (Embankment Feasibility Design).

Additional information about the services needed is contained in the Request for Proposals (RFP).  Additional information about the project is available at www.TualatinBasinWaterSupply.org.

Interested consultants must submit proposals. Proposals are due March 30, 2017 to John Dummer, Principal Engineer, at CWS’ Administrative Building Complex, at 2550 SW Hillsboro Highway, Hillsboro, OR  97123 at 4:00 p.m.  Late proposals and submissions via fax or e-mail will not be accepted.  Proposals will not be publicly opened or read aloud.

You may request an electronic copy of the RFP by completing the "How to Request this Package" section  below.  This information will be accumulated for a Bid Holders List and your email will be used to send you automatic notifications when CWS posts a new document or changes information related to this RFP. Consultants are responsible for obtaining any Addenda by using the link provided in the automatic email. If you would also like to receive notifications by RSS feed, you may subscribe to CWS’ Open Solicitations RSS feed at http://bids.cleanwaterservices.org. If you experience problems downloading the RFP, please contact Donna Eason at (503) 681-5110. 
 
CWS may reject any proposal not in compliance with all prescribed procedures and requirements, and may cancel this solicitation or reject, for good cause, any or all proposals upon a finding that it is in the public interest to do so.

This package cannot be requested

This solicitation has closed. Thank you for your interest!

Bid Results

Name Type Size Date
NOITA Dam Engineering Feasibility Design Consulting to HDR Engineering dtd 2017-05-02.pdf Intent To Award 56.6 KB 5/2/2017
Clean Water Waterfall

Enhancing the environment and quality of life in the Tualatin River Watershed through visionary and collaborative management of water resources in partnership with others.

© 2017 Clean Water Services | Privacy Policy